Bedworth Physical Activity Hub

We delivered a full-scope surface package on this project, managing everything from structural waterproofing to final architectural finishes. Handling the entire sequence allowed us to guarantee tight tolerances and seamless trade transitions throughout.

​

Project Scope:

  • Tanking: Installed a robust waterproofing system to protect the structure against hydrostatic pressure and moisture ingress.

  • Screeding: Laid high-tolerance floor screeding to establish a perfectly level, durable subfloor ready for finishes.

  • Rendering: Applied flat, plumb wall rendering to provide a consistent substrate and a durable, clean finish.

  • Tiling: Executed precision wall and floor tiling with strict attention to set-out, joint alignment, and grout consistency.

  • Mastic Works: Completed all final expansion joints and perimeter sealing with color-matched, high-movement mastic for a clean, watertight finish.

​

Client: BAM

​​

Contract Value: £1,020,000

​

Completion Date: Completed May 2026